skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: N-16 monitors: Almaraz NPP experience

Conference ·
OSTI ID:467916
 [1]
  1. Almaraz NPP, Madrid (Spain)

Almaraz Nuclear Power Plant has installed N-16 monitors - one per steam generator - to control the leakage rate through the steam generator tubes after the application of leak before break (LBB) criteria for the top tube sheet (TTS). After several years of operation with the N-16 monitors, Almaraz NPP experience may be summarized as follows: N-16 monitors are very useful to follow the steam generator leak rate trend and to detect an incipient tube rupture; but they do not provide an exact absolute leak rate value, mainly when there are small leaks. The evolution of the measured N-16 leak rates varies along the fuel cycle, with the same trend for the 3 steam generators. This behaviour is associated with the primary water chemistry evolution along the cycle.

Research Organization:
CH2M Hill, Gainesville, FL (United States); Argonne National Lab. (ANL), Argonne, IL (United States)
OSTI ID:
467916
Report Number(s):
NUREG/CP-0154; ANL-96/14; NEA/CNRA/R-(96)1; CONF-9510423-; ON: TI97004312; TRN: 97:008382
Resource Relation:
Conference: CNRA/CSNI workshop on steam generator tube integrity in nuclear power plants, Oak Brook, IL (United States), 30 Oct - 2 Nov 1995; Other Information: PBD: Feb 1997; Related Information: Is Part Of Proceedings of the CNRA/CSNI workshop on steam generator tube integrity in nuclear power plants; Diercks, D.R. [Argonne National Lab., IL (United States)]; PB: 621 p.
Country of Publication:
United States
Language:
English