Title: Removal and repair of EBR-II primary sodium pump No. 1

Technical Report ·
DOI:https://doi.org/10.2172/4660202· OSTI ID:4660202

Sodium pump No. 1 in the primary system of Experimental Breeder Reactor II (EBR-II) was removed because of periodic increases in its power consumption with no corresponding changes in primary sodium flow. Before removal, the pump had been operated satisfactorily for over 32,000 hr during an eight-year period. Disassembly of the pump revealed heavy oxide deposits on the pump shaft at and above the lower labyrinth. The labyrinth itself was badly corroded and and required replacement. The entire pump assembly was disassembled, cleaned, inspected, and re-assembled before re-installation in the primary tank. Some minor alterations were made to the pump assembly to improve its performance. The most significant alteration was the relocation o the sodium drain holes in the baffle sub-assembly. This change will direct the argon purge in a manner expected to reduce sodium oxide deposits on the pump shaft. Pump operation subsequent to repair and re-installation has been normal. Shaft torques and power consumption have returned to the levels experienced before pump difficulties developed.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
US Atomic Energy Commission (AEC)
DOE Contract Number:
W-31-109-ENG-38
NSA Number:
NSA-26-052362
OSTI ID:
4660202
Report Number(s):
ANL-7835
Country of Publication:
United States
Language:
English