skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

Technical Report ·
DOI:https://doi.org/10.2172/362489· OSTI ID:362489

This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
362489
Report Number(s):
HNF-3047; ON: DE99050780; BR: EW3130010; TRN: AHC29926%%144
Resource Relation:
Other Information: PBD: 24 Sep 1998
Country of Publication:
United States
Language:
English