Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan
This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 362489
- Report Number(s):
- HNF-3047; ON: DE99050780; BR: EW3130010; TRN: AHC29926%%144
- Resource Relation:
- Other Information: PBD: 24 Sep 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
WE-A-16A-01: International Medical Physics Symposium: Increasing Access to Medical Physics Education/Training and Research Excellence
Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing