Test plan for BWID Phase 2 electric arc melter vitrification tests
This test plan describes the Buried Waste Integrated Demonstration (BWID), Phase 2, electric arc melter, waste treatment evaluation tests to be performed at the US Bureau of Mines (USBM) Albany Research Center. The BWID Arc Melter Vitrification Project is being conducted to evaluate and demonstrate existing industrial arc melter technology for thermally treating mixed transuranic-contaminated wastes and soils. Phase 1 baseline tests, performed during fiscal year 1993 at the USBM, were conducted on waste feeds representing incinerated buried mixed wastes and soils. In Phase 2, surrogate feeds will be processed that represent actual as-retrieved buried wastes from the Idaho National Engineering Laboratory`s Subsurface Disposal Area at the Radioactive Waste Management Complex.
- Research Organization:
- Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC07-94ID13223
- OSTI ID:
- 34315
- Report Number(s):
- INEL-94/0004; ON: DE95008622; TRN: 95:009618
- Resource Relation:
- Other Information: PBD: Oct 1994
- Country of Publication:
- United States
- Language:
- English