PUR-1 Water Processing and Cooling System Upgrade
- Purdue Univ., West Lafayette, IN (United States)
The project objective was to purchase equipment related to the safety and operational capability of PUR-1. Following a 10x power uprate and the return to an active operational cycle, a water process system replacement is required to maintain the bulk coolant temperature within the bounds of the Technical Specification limit at the PUR-1. The replacement project will ensure safety and availability of the PUR-1 for long duration operational cycles and applicability to the largest possible customer base. The equipment to be purchased for this work includes a new main coolant pump rated to at least 30 gallons per minute, a heat exchanger to remove heat from the primary coolant, and a chiller system to release the heat to the environment via city water. The proposed system exactly replicates the installed system with a slight increase in capacity.
- Research Organization:
- Purdue Univ., West Lafayette, IN (United States)
- Sponsoring Organization:
- USDOE Office of Nuclear Energy (NE), Nuclear Energy University Program (NEUP)
- DOE Contract Number:
- NE0009011
- OSTI ID:
- 1907923
- Report Number(s):
- DOE-PURDUE-0009011; TRN: US2313639
- Country of Publication:
- United States
- Language:
- English
Similar Records
Upgrade of Instrumentation for Purdue Reactor PUR-1
UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3