skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RECENT RESULTS AND OPPORTUNITIES AT THE IOTA FACILITY

Conference ·
OSTI ID:1614724

The Integrable Optics Test Accelerator (IOTA) was recently commissioned as part of the Fermilab Accelerator Science and Technology (FAST) facility. The IOTA ring was briefly operated with electrons at 47 MeV followed by a 6-months run with 100 MeV electrons. The main goal of the first runwas to study beam dynamics in the integrable lattices with elliptical nonlinear magnets and in the quasi-integrable case with profiled octupole channel. The flexibility of the IOTA ring allowed a wide range of complementary studies, such as experiments with a single electron; studies of fluctuations in undulator radiation and operation with low emittance beams. Over the next year the proton injector will be installed and two runs carried out. One run will be dedicated to the refinement of nonlinear experiments and another will be dedicated to the proof-of-principle demonstration of Optical Stochastic Cooling.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
Contributing Organization:
IOTA
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1614724
Report Number(s):
FERMILAB-CONF-19-675-AD; oai:inspirehep.net:1790794
Resource Relation:
Conference: 8th International Beam Instrumentation Conference, Malmo, Sweden, 09/08-09/12/2019
Country of Publication:
United States
Language:
English

Similar Records

Related Subjects