Vertical Magnetic Measurements of the First Full-Length Prototype MQXFAP2 Quadrupole for the LHC Hi-Lumi Accelerator Upgrade Project
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Argonne National Lab. (ANL), Lemont, IL (United States)
- Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
This paper reports the commissioning of the vertical magnetic measurement system and the room temperature (warm) and cryogenic (cold) magnetic field measurements of the first full-length (4.2 m) quadrupole built by the U.S. Accelerator Upgrade Project (AUP) (formerly the LARP collaboration) for the high luminosity upgrade of the Large Hadron Collider at CERN. The magnet, designated MQXFAP2, is a prototype preceding production for the AUP which will provide ten sets of 8.4-m superconducting insertion region quadrupoles for the Hi-Lumi Upgrade. The quadrupoles will be built by assembling two 4.2-m magnets in a single cryostat. Agreement between Brookhaven National Laboratory's (BNL's) and Lawrence Berkeley National Laboratory's (LBNL's) warm measurement data has indicated that the upgraded vertical magnetic measurement system at Brookhaven National Laboratory is ready for MQXFA magnet production testing. Lastly, the cold magnetic measurement has been performed and preliminary data analysis has been conducted.
- Research Organization:
- Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- Grant/Contract Number:
- AC02-05CH11231
- OSTI ID:
- 1564056
- Journal Information:
- IEEE Transactions on Applied Superconductivity, Vol. 29, Issue 5; ISSN 1051-8223
- Publisher:
- Institute of Electrical and Electronics Engineers (IEEE)Copyright Statement
- Country of Publication:
- United States
- Language:
- English
Web of Science
Similar Records
Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project
Test Results of the First Two Full-Length Quadrupole Magnets for the LHC Hi Lumi Upgrade