Low Level RF Control for the PIP-II Accelerator
Conference
·
OSTI ID:1438539
- Fermilab
- Bhabha Atomic Res. Ctr.
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into the booster that levies tight requirements on the LLRF control system for the cavities. In this paper we discuss the challenges of the PIP-II accelerator and the present status of the LLRF system for this project.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1438539
- Report Number(s):
- arXiv:1803.08211; FERMILAB-CONF-17-564-AD-TD; LLRF2017-O-15; 1663615
- Resource Relation:
- Conference: Low Level Radio Frequency Workshop 2017, Barcelona, Catalonia, Spain, 10/16-10/19/2017
- Country of Publication:
- United States
- Language:
- English
Similar Records
LLRF System for the Fermilab PIP-II Superconducting LINAC
PIP-II Status and Strategy
R & D on Beam Injection and Bunching Schemes in the Fermilab Booster
Conference
·
Wed Nov 01 00:00:00 EDT 2023
·
OSTI ID:1438539
+10 more
PIP-II Status and Strategy
Conference
·
Mon Jun 01 00:00:00 EDT 2015
·
OSTI ID:1438539
+3 more
R & D on Beam Injection and Bunching Schemes in the Fermilab Booster
Conference
·
Fri Jan 01 00:00:00 EST 2016
·
OSTI ID:1438539