BEAM EXTRACTION FROM THE RECYCLER RING TO P1 LINE AT FERMILAB
- Fermilab
The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. It was designed in 2012. The kicker magnets at RR520 and the lambertson magnet at RR522 in the RR were installed in 2014 Summer Shutdown, the elements of RR to P1 Stub (permanent quads, trim quads, correctors, BPMs, the toroid at 703 and vertical bending dipole at V703 (ADCW) were installed in 2015 Summer Shutdown. On Tuesday, June 21, 2016, beam line from the Recycler Ring to P1 line was commissioned. The detailed results will be presented in this report.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1341806
- Report Number(s):
- FERMILAB-CONF-16-417-AD; 1511038
- Resource Relation:
- Conference: 2nd North American Particle Accelerator Conference, Chicago, Illinois, USA, 10/09-10/14/2016
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development of Cogging at the Fermilab Booster
Transport from the Recycler Ring to the Antiproton Source Beamlines