skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: BEAM EXTRACTION FROM THE RECYCLER RING TO P1 LINE AT FERMILAB

Conference ·
OSTI ID:1341806

The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. It was designed in 2012. The kicker magnets at RR520 and the lambertson magnet at RR522 in the RR were installed in 2014 Summer Shutdown, the elements of RR to P1 Stub (permanent quads, trim quads, correctors, BPMs, the toroid at 703 and vertical bending dipole at V703 (ADCW) were installed in 2015 Summer Shutdown. On Tuesday, June 21, 2016, beam line from the Recycler Ring to P1 line was commissioned. The detailed results will be presented in this report.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1341806
Report Number(s):
FERMILAB-CONF-16-417-AD; 1511038
Resource Relation:
Conference: 2nd North American Particle Accelerator Conference, Chicago, Illinois, USA, 10/09-10/14/2016
Country of Publication:
United States
Language:
English

Similar Records

Permanent magnets for beamlines and the recycler ring at Fermilab
Conference · Thu Oct 01 00:00:00 EDT 1998 · OSTI ID:1341806

Development of Cogging at the Fermilab Booster
Conference · Fri Jan 30 00:00:00 EST 2015 · OSTI ID:1341806

Transport from the Recycler Ring to the Antiproton Source Beamlines
Conference · Mon May 14 00:00:00 EDT 2012 · Conf.Proc.C1205201:2026-2028,2012 · OSTI ID:1341806

Related Subjects