A Level 3 pollution prevention opportunity assessment (PPOA) was performed for the K-1501 Steam Plant at the K-25 Site. The primary objective was to identify and evaluate pollution prevention (P2) options to reduce the quantities of each waste stream generated by the Steam Plant. For each of the waste streams, P2 options were evaluated to first reduce the quantity of waste generated and second to recycle the waste. This report provides a process description of the facility; identification, evaluation, and recommendations of P2 options; an implementation schedule with funding sources; and conclusions. Largely for economic reasons, only 3 of the 14 P2 options are being recommended for implementation. All are source reduction options. When implemented, these three options are estimated to reduce the annual generation of waste by 658,412 kg and will result in a cost savings of approximately $29,232/year for the K-25 Site. The recommended options are to: install a flue gas return System in Boiler 7; reduce steam loss from traps; and increase lapse time between rinses. The four boilers currently in operation at the Steam Plant use natural gas or fuel oil as fuel sources.

Research Organization:
PAI Corp., Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
119871
Report Number(s):
K/WM-97; ON: DE96001442; TRN: 95:024436
Resource Relation:
Other Information: PBD: Sep 1995
Country of Publication:
United States
Language:
English