Analysis of RHIC beam dump pre-fires
Conference
·
OSTI ID:1017402
It has been speculated that the beam may cause instability of the RHIC Beam Abort Kickers. In this study, we explore the available data of past beam operations, the device history of key modulator components, and the radiation patterns to examine the correlations. The RHIC beam abort kicker system was designed and built in the 90's. Over last decade, we have made many improvements to bring the RHIC beam abort kicker system to a stable operational state. However, the challenge continues. We present the analysis of the pre-fire, an unrequested discharge of kicker, issues which relates to the RHIC machine safety and operational stability.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States). Relativistic Heavy Ion Collider (RHIC)
- Sponsoring Organization:
- DOE - OFFICE OF SCIENCE
- DOE Contract Number:
- DE-AC02-98CH10886
- OSTI ID:
- 1017402
- Report Number(s):
- BNL-94156-2011-CP; R&D Project: KBCH139; 18037; KB0202011; TRN: US1103241
- Resource Relation:
- Conference: 2011 Particle Accelerator Conference (PAC'11); New York, NY; 20110328 through 20110401
- Country of Publication:
- United States
- Language:
- English
Similar Records
Analysis of beam loss induced abort kicker instability
AN ENGINEERING SOLUTION TO THE RHIC BEAM ABORT KICKER UPGRADE.
RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES.
Conference
·
Sun May 20 00:00:00 EDT 2012
·
OSTI ID:1017402
+5 more
AN ENGINEERING SOLUTION TO THE RHIC BEAM ABORT KICKER UPGRADE.
Conference
·
Sun May 23 00:00:00 EDT 2004
·
OSTI ID:1017402
RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES.
Conference
·
Mon Jun 18 00:00:00 EDT 2001
·
OSTI ID:1017402
+3 more