skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Foothills Parkway Section 8B Final Environmental Report, Volume 4, Appendices E-I

Technical Report ·
DOI:https://doi.org/10.2172/10163· OSTI ID:10163

In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west. The major deliverables for the project are listed. From August 1995 through October 1996, NPS, GSMNP, and ORNL staff interacted with Federal Highway Administration staff to develop a conceptual design plan for Section 8B with the intent of protecting critical, resources identified during the ER process to the extent possible. In addition, ORNL arranged for bioengineering experts to discuss techniques that might be employed on Section 8B with NPS, GSMNP, and ORNL staff during September 1996. For the purposes of this ER, there are two basic alternatives under consideration: (1) a build alternative and (2) a no-build alternative. Within the build alternative are a number of options including constructing Section 8B with no interchanges, constructing Section 8B with an interchange at SR 416 or U.S. 321, constructing Section 8B with a spur road on Webb Mountain, and considering operation of Section 8B both before and after the operation of Section 8C. The no-build alternative is considered the no-action alternative and is not to construct Section 8B. This volume of the ER consists of Appendices E through I (all ecological survey reports), which are summarized individually in the sections that follow. The following conclusions result from the completion of these surveys and the ER impact analysis: (1) Forest clearing should be limited as much as possible; (2) Disturbed areas should be replanted with native trees; (3) Drainages should be bridged rather than leveled with cut and fill; (4) For areas of steep slopes and potential erosion, bioengineering techniques should be implemented; (5) The Webb Mt. spur road is not recommended. If the spur road is built no grass shoulders should be used (to minimize forest fragmentation impacts); and (6) Transplanting of protected plants should be done when possible. Construction in wetland areas should be avoided and erosion and sedimentation mitigation measures discussed under water resources and aquatic ecology should be implemented.

Research Organization:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
Denver Service Center; The Great Smoky Mountains National Park; The National Park Service (US)
DOE Contract Number:
AC05-96OR22464
OSTI ID:
10163
Report Number(s):
ORNL/M-5910/V4; TRN: AH200125%%356
Resource Relation:
Other Information: PBD: 1 Jul 1999
Country of Publication:
United States
Language:
English