skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Description of work for 200-UP-1 characterization of monitoring wells. Revision 1

Technical Report ·
DOI:https://doi.org/10.2172/10156411· OSTI ID:10156411

This description of work details the field activities associated with the drilling, soil sampling, and construction of groundwater monitoring and dual-use wells as part of the Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit and will serve as a field guide for those performing the work. It will be used in conjunction with DOE-RE and Environmental Investigations and Site Characterization Manual. Groundwater wells are being constructed to characterize the vertical and horizontal extent of the Uranium and {sup 99}Tc plumes and to define aquifer properties such as hydraulic communication between aquifers and hydrostratigraphy. Some of these wells may be utilized for extraction purposes during the Interim Remedial Measures (IRM) phase anticipated at this operable unit and are being designed with a dual use in mind. These data will be used to optimize the IRM for the cleanup of these two plumes. The data will also be used with later Limited Field Investigation data to perform a Qualitative Risk Assessment for the operable unit. The locations for the proposed groundwater wells are presented. The contaminants of concern for the project are presented also.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10156411
Report Number(s):
WHC-SD-EN-AP-151-Rev.1; ON: DE94012932; BR: 35AF11201/35AF11202
Resource Relation:
Other Information: PBD: 31 Mar 1994
Country of Publication:
United States
Language:
English