skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Design of the AGS Booster Beam Position Monitor electronics

Conference ·
OSTI ID:10119615

The operational requirements of the AGS Booster Beam Position Monitor system necessitate the use of electronics with wide dynamic range and broad instantaneous bandwidth. Bunch synchronization is provided by a remote timing sequencer coupled to the local ring electronics via digital fiber-optic links. The Sequencer and local ring circuitry work together to provide single turn trajectory or average orbit and intensity information, integrated over 1 to 225 bunches. Test capabilities are built in for the purpose of enhancing BPM system accuracy. This paper describes the design of the Booster Beam Position Monitor electronics, and presents performance details of the front end processing, acquisition and timing circuitry.

Research Organization:
Brookhaven National Lab., Upton, NY (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
10119615
Report Number(s):
BNL-45419; CONF-910505-434; ON: DE92007577
Resource Relation:
Conference: 1991 Institute of Electrical and Electronics Engineers (IEEE) particle accelerator conference (PAC),San Francisco, CA (United States),6-11 May 1991; Other Information: PBD: [1991]
Country of Publication:
United States
Language:
English