skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Expert system requirements for power system restoration

Journal Article · · IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States)
DOI:https://doi.org/10.1109/59.336099· OSTI ID:6958613
 [1];  [2];  [3]
  1. IRD Corp., Bethesda, MD (United States)
  2. Potomac Electric Power Co., Washington, DC (United States)
  3. Baltimore Gas and Electric Co., Baltimore, MD (United States)

This paper is one of series presented on behalf of the System Operation Subcommittee with the intent of focusing industry attention on power system restoration. Expert systems are being considered for restoring bulk power supplies. In general, there are three restoration periods following a major power disturbance: establishment of initial sources of power, re-integration of a skeleton of the bulk power supply, and minimization of the unserved loads. Expert systems together with analytical tools have the potential of addressing the restoration procedures over these three periods. This paper describes the expert system requirements from the point of view of the practicing power engineers with emphasis placed on the initial power sources and requirements. The paper draws on the previous reports by the Power System Restoration Working Group.

OSTI ID:
6958613
Journal Information:
IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States), Vol. 9:3; ISSN 0885-8950
Country of Publication:
United States
Language:
English

Similar Records

Analytical tool requirements for power system restoration
Journal Article · Mon Aug 01 00:00:00 EDT 1994 · IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States) · OSTI ID:6958613

Special considerations in power system restoration
Journal Article · Sun Nov 01 00:00:00 EST 1992 · IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States) · OSTI ID:6958613

Nuclear plant requirements during power system restoration
Journal Article · Tue Aug 01 00:00:00 EDT 1995 · IEEE Transactions on Power Systems · OSTI ID:6958613