A 4-km landfall tunnel was constructed to provide an approach to the rugged Norwegian coast for 36 and 40-in. offshore pipelines in Troll Phase 1 development. The tunnel terminates in 165 m of water with three vertical shaft connections to the seabed. Construction consisted of two main elements: 180 metric ton tie-in spools installed between the offshore pipelines and the piercing shafts, and prefabricated 450 metric ton riser bundles installed in the vertical tunnel piercing shafts. The paper describes the seabed route, the tie-in design approach, and construction on the seabed and underground. First gas is scheduled to flow in April, 1996.
- OSTI ID:
- 136985
- Journal Information:
- Oil and Gas Journal, Vol. 93, Issue 49; Other Information: PBD: 4 Dec 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Troll Phase I pipelines: Tie-ins to the subsea tunnel
Troll Phase 1, design and execution of large scale rockdumping on a soft uneven seabed
Troll Phase 1, installation of large spools before pipelay
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:136985
Troll Phase 1, design and execution of large scale rockdumping on a soft uneven seabed
Conference
·
Sun Dec 01 00:00:00 EST 1996
·
OSTI ID:136985
+2 more
Troll Phase 1, installation of large spools before pipelay
Conference
·
Sun Dec 01 00:00:00 EST 1996
·
OSTI ID:136985