Troll Phase I pipelines: Tie-ins to the subsea tunnel

Conference ·
OSTI ID:160647

Subsea approaches to the Norwegian coast are characterized by very rugged topography. Landfall of offshore pipelines therefore often require dedicated subsea tunnel and pipeline tie in concepts. To land the 36 inch and 40 inch offshore pipelines associated with the Troll Phase 1 development, a 4 km long landfall tunnel was constructed terminating at a water depth of 165 m with vertical shaft connections to the seabed. This paper describes the design of the Troll Phase 1 tie-ins of offshore to tunnel pipeline sections. These comprise two main elements, i.e. 180 Te tie-in spools -- which are installed between the offshore pipelines and the piercing shafts -- and prefabricated 450 Te riser bundles -- which are installed into the vertical tunnel piercing shafts.

OSTI ID:
160647
Report Number(s):
CONF-950501--
Country of Publication:
United States
Language:
English

Similar Records

Tunnel allows landfall approach for Troll pipeline
Journal Article · Sun Dec 03 23:00:00 EST 1995 · Oil and Gas Journal · OSTI ID:136985

Troll Phase 1, installation of large spools before pipelay
Conference · Sat Nov 30 23:00:00 EST 1996 · OSTI ID:400903

Troll Phase 1, design and execution of large scale rockdumping on a soft uneven seabed
Conference · Sat Nov 30 23:00:00 EST 1996 · OSTI ID:400902