DOE Data Explorer title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Heavy-Duty Electric Fleet Depot Charging Load Profiles & Substation Load Integration Assessment Results

Abstract

This data set includes the 24-hour fleet depot charging load profiles (15-min. average demand) and substation load integration assessment results produced for the study, "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems", published in 2021 (https://doi.org/10.1038/s41560-021-00855-0). The code developed to generate these load profiles is publicly available at https://github.com/NREL/hdev-depot-charging-2021. Please cite as: Borlaug, B., Muratori, M., Gilleran, M., Woody, D., Muston, W., Canada, T., Ingram, A., Gresham, H., and McQueen, C., (2021). "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems". https://doi.org/10.1038/s41560-021-00855-0.

Authors:
ORCiD logo ; ORCiD logo ; ORCiD logo ; ; ; ; ; ;
  1. National Renewable Energy Laboratory; OSTI
  2. National Renewable Energy Laboratory
  3. Oncor Electric Delivery Co. LLC
  4. Oncor Electric Deliver Co. LLC
  5. Southern Company
Publication Date:
Other Number(s):
7.2.0.403 Analytical Modeling at NREL
Research Org.:
National Renewable Energy Laboratory - Data (NREL-DATA), Golden, CO (United States); National Renewable Energy Laboratory (NREL), Golden, CO (United States)
Sponsoring Org.:
National Renewable Energy Laboratory (NREL), Golden, CO (United States)
Subject:
24 POWER TRANSMISSION AND DISTRIBUTION; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; EV-grid integration; NREL; charging; data; distribution systems; electric vehicle; energy; heavy-duty vehicles
OSTI Identifier:
1787031
DOI:
https://doi.org/10.7799/1787031

Citation Formats

Borlaug, Brennan, Muratori, Matteo, Gilleran, Madeline, Woody, David, Muston, William, Canada, Thomas, Ingram, Andrew, Gresham, Hal, and McQueen, Charlie. Heavy-Duty Electric Fleet Depot Charging Load Profiles & Substation Load Integration Assessment Results. United States: N. p., 2021. Web. doi:10.7799/1787031.
Borlaug, Brennan, Muratori, Matteo, Gilleran, Madeline, Woody, David, Muston, William, Canada, Thomas, Ingram, Andrew, Gresham, Hal, & McQueen, Charlie. Heavy-Duty Electric Fleet Depot Charging Load Profiles & Substation Load Integration Assessment Results. United States. doi:https://doi.org/10.7799/1787031
Borlaug, Brennan, Muratori, Matteo, Gilleran, Madeline, Woody, David, Muston, William, Canada, Thomas, Ingram, Andrew, Gresham, Hal, and McQueen, Charlie. 2021. "Heavy-Duty Electric Fleet Depot Charging Load Profiles & Substation Load Integration Assessment Results". United States. doi:https://doi.org/10.7799/1787031. https://www.osti.gov/servlets/purl/1787031. Pub date:Tue Apr 20 00:00:00 EDT 2021
@article{osti_1787031,
title = {Heavy-Duty Electric Fleet Depot Charging Load Profiles & Substation Load Integration Assessment Results},
author = {Borlaug, Brennan and Muratori, Matteo and Gilleran, Madeline and Woody, David and Muston, William and Canada, Thomas and Ingram, Andrew and Gresham, Hal and McQueen, Charlie},
abstractNote = {This data set includes the 24-hour fleet depot charging load profiles (15-min. average demand) and substation load integration assessment results produced for the study, "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems", published in 2021 (https://doi.org/10.1038/s41560-021-00855-0). The code developed to generate these load profiles is publicly available at https://github.com/NREL/hdev-depot-charging-2021. Please cite as: Borlaug, B., Muratori, M., Gilleran, M., Woody, D., Muston, W., Canada, T., Ingram, A., Gresham, H., and McQueen, C., (2021). "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems". https://doi.org/10.1038/s41560-021-00855-0.},
doi = {10.7799/1787031},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Apr 20 00:00:00 EDT 2021},
month = {Tue Apr 20 00:00:00 EDT 2021}
}