Electromagnetic Borehole Flowmeter Surveys at Selected In Situ Redox Manipulation Barrier Wells, Zero-Valent Iron Site, Hanford, Washington

Technical Report ·
DOI:https://doi.org/10.2172/982967· OSTI ID:982967
Ambient (i.e., static) and dynamic (i.e., pumping-induced) electromagnetic borehole flowmeter (EBF) surveys were performed in 10 selected In Situ Redox Manipulation (ISRM) barrier wells to characterize the distribution of in-well vertical flow conditions and to infer the relative hydraulic conductivity distribution in the upper-part of the unconfined aquifer. These wells are located in two areas where the aquifer is targeted for testing of zero-valent iron injection to mend a failed portion of the ISRM barrier at the 100 D Area, Hanford Site. Each of these two areas consists of a group of five wells, one group to the southwest and one group to the northeast. The upper ~15 to 20 ft (~4.6 to 6.1 m) of the unconfined aquifer was characterized for in-well vertical flow conditions and vertical profile information regarding relative hydraulic conductivity. At some well site locations, the upper ~2 to 3 ft (~0.6 to 1 m) of the well-screen interval could not be characterized under pumping (dynamic) conditions because of the presence of the pump.
Research Organization:
Pacific Northwest National Laboratory (PNNL), Richland, WA (US)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
982967
Report Number(s):
PNNL-18218
Country of Publication:
United States
Language:
English

Similar Records

Electromagnetic Borehole Flowmeter Testing in R-Area
Technical Report · Thu Oct 12 00:00:00 EDT 2000 · OSTI ID:765407

Measuring hydraulic conductivity with the borehole flowmeter
Technical Report · Fri Sep 01 00:00:00 EDT 1989 · OSTI ID:5650255

Electromagnetic Borehole Flowmeter (EBF) Testing at the Southwest Plume Test Pad (U)
Technical Report · Tue Dec 12 23:00:00 EST 2000 · OSTI ID:1469274