Electromagnetic Borehole Flowmeter (EBF) Testing at the Southwest Plume Test Pad (U)
- Savannah River Site (SRS), Aiken, SC (United States)
Multiple-well aquifer tests were recently conducted at the Southwest Plume Test Pad near the Burial Ground Complex (BGC) in accordance with the BGC Field Investigation Plan (WSRC,1999). The pumping tests were performed in the Upper Three Runs and Gordon aquifers in February and March of 1999. The tests provide reliable estimates of horizontal conductivity averaged over aquifer thickness, and a relatively large horizontal zone of influence. Table 1 summarizes the results of WSRC (1999). To complement these results, Electromagnetic Borehole Flowmeter (EBF) testing using the 1” ID EBF was performed to determine the vertical variation of horizontal conductivity for SWP-300A, SWP-200C and SWP-100D.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC09-08SR22470
- OSTI ID:
- 1469274
- Report Number(s):
- WSRC-TR--2000-00347
- Country of Publication:
- United States
- Language:
- English
Similar Records
Electromagnetic Borehole Flowmeter Testing at the Southwest Plume Test Pad
Electromagnetic Borehole Flowmeter Testing in R-Area
Electromagnetic Borehole Flowmeter (EBF) Testing in R-area (U)
Technical Report
·
Sun Jan 28 23:00:00 EST 2001
·
OSTI ID:774272
Electromagnetic Borehole Flowmeter Testing in R-Area
Technical Report
·
Thu Oct 12 00:00:00 EDT 2000
·
OSTI ID:765407
Electromagnetic Borehole Flowmeter (EBF) Testing in R-area (U)
Technical Report
·
Wed Sep 13 00:00:00 EDT 2000
·
OSTI ID:1469275