Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Fermilab Main Injector Collimation Systems: Design, Commissioning and Operation

Conference ·
OSTI ID:952256

The Fermilab Main Injector is moving toward providing 400 kW of 120 GeV proton beams using slip stacking injection of eleven Booster batches. Loss of 5% of the beam at or near injection energy results in 1.5 kW of beam loss. A collimation system has been implemented to localize this loss with the design emphasis on beam not captured in the accelerating RF buckets. More than 95% of these losses are captured in the collimation region. We will report on the construction, commissioning and operation of this collimation system. Commissioning studies and loss measurement tools will be discussed. Residual radiation monitoring of the Main Injector machine components will be used to demonstrate the effectiveness of these efforts.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
952256
Report Number(s):
FERMILAB-CONF-09-167-AD
Country of Publication:
United States
Language:
English

Similar Records

Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler
Conference · Thu Oct 29 20:00:00 EDT 2020 · No journal information · OSTI ID:1572511

Collimation system for beam loss localization with slip stacking injection in the Fermilab Main Injector
Conference · Mon Sep 01 00:00:00 EDT 2008 · OSTI ID:940419

Fermilab Recycler Collimation System Design
Conference · Tue Oct 04 00:00:00 EDT 2016 · OSTI ID:1329664