Fermilab Recycler Collimation System Design
- Fermilab
To provide 700 kW proton beams for neutrino production in the NuMI facility, we employ slip stacking in the Recycler with transfer to the Main Injector for recapture and acceleration. Slip stacking with 12 Booster batches per 1.33 sec cycle of the Main Injector has been implemented and briefly tested while extensive operation with 8 batches and 10 batches per MI cycle has been demonstrated. Operation in this mode since 2013 shows that loss localization is an essential component for long term operation. Beam loss in the Recycler will be localized in a collimation region with design capability for absorbing up to 2 kW of lost protons in a pair of 20-Ton collimators (absorbers). This system will employ a two stage collimation with a thin molybdenum scattering foil to define the bottom edge of both the injected and decelerated-for-slipping beams. Optimization and engineering design of the collimator components and radiation shielding are based on comprehensive MARS15 simulations predicting high collimation efficiency as well as tolerable levels of prompt and residual radiation. The system installation during the Fermilab 2016 facility shutdown will permit commissioning in the subsequent operating period.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1329664
- Report Number(s):
- FERMILAB-CONF-16-425-AD; 1493780
- Resource Relation:
- Conference: 2nd North American Particle Accelerator Conference, Chicago, Illinois, USA, 10/09-10/14/2016
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fermilab Main Injector Collimation Systems: Design, Commissioning and Operation
Simulations of the Fermilab Recycler for Losses and Collimation