Thinking Inside the Box
Conference
·
OSTI ID:920012
In early 2007, SLAC was faced with a shortage of both electrical power and cooling in the main computer building, at the same time that the BaBar collaboration needed a new cluster of 250 batch machines installed. A number of different options were explored for the expansion. Provision of additional electrical power to the building was estimated to take one to two years, and cost several million dollars; additional cooling was even worse. Space in a Silicon Valley co-location facilities was reasonable on a one-year timescale, but broke even in costs by the end of three years, and were more expensive after that. There were also unresolved questions about the affects of additional latency from an offsite compute cluster to the onsite disk servers. The option of converting existing experimental hall space into computer space was estimated at one year, with uncertain availability. An option to aggressively replace several existing clusters with more power-efficient equipment was studied closely, but was disruptive to continued operations, expensive, and didn't provide any additional headroom. Finally, the installation of a Sun Project Blackbox (PBB) unit was selected as providing the capacity on a timescale of six months for a reasonable cost with minimal disruption to service. SLAC obtained and installed a beta unit and have been running it in production since September 2007. The experiences described are with the Early Access version of the PBB. The production version of the box has engineering changes based in part on our experiences.
- Research Organization:
- Stanford Linear Accelerator Center (SLAC)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-76SF00515
- OSTI ID:
- 920012
- Report Number(s):
- SLAC-PUB-12986
- Country of Publication:
- United States
- Language:
- English
Similar Records
Ducts in the Attic? What Were They Thinking? Preprint
Leveraging the LEDA high voltage power supply systems for the LANSCE refurbishment project
Comparison of Resource Platform Selection Approaches for Scientific Workflows
Conference
·
Sun Aug 01 00:00:00 EDT 2010
·
OSTI ID:988099
Leveraging the LEDA high voltage power supply systems for the LANSCE refurbishment project
Journal Article
·
Mon Dec 31 23:00:00 EST 2007
·
OSTI ID:960727
Comparison of Resource Platform Selection Approaches for Scientific Workflows
Conference
·
Thu Mar 04 23:00:00 EST 2010
·
OSTI ID:1168744