Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

NSLS IN-VACUUM UNDULATORS AND MINI-BETA STRAIGHTS.

Conference ·
OSTI ID:914484
We review the work carried out in the X13 R&D Straight Section of the NSLS X-Ray Ring on small gap in-vacuum undulators (IVUNs). Then we discuss: (1) plans to replace the pure permanent magnet undulator in X13 by a hybrid design providing stronger magnetic fields, enhancing the tunability of the device; (2) plans to install hybrid IVUNs in the two RF straights of the X-Ray Ring, increasing the number of insertion devices in the XRay Ring to eight; (3) the possibility of reducing the vertical beta function in the X13 straight from 0.33 m down to 0.16 m. This reduction in beta function would allow us to decrease the usable undulator gap from 3mm down to 2mm, further increasing the tuning range.
Research Organization:
BROOKHAVEN NATIONAL LABORATORY
Sponsoring Organization:
Doe - Office Of Energy Research
DOE Contract Number:
AC02-98CH10886
OSTI ID:
914484
Report Number(s):
BNL--68403; KC0204011
Country of Publication:
United States
Language:
English

Similar Records

The NSLS X13 Mini-Gap Undulator: Design and Performance
Journal Article · Wed May 12 00:00:00 EDT 2004 · AIP Conference Proceedings · OSTI ID:20652930

Insertion device development in the X13 straight of the NSLS X-Ray Ring
Conference · Tue Jul 01 00:00:00 EDT 1997 · OSTI ID:495808

Initial Results from an In-Vacuum Undulator in the NSLS X-ray Ring
Conference · Fri Oct 31 23:00:00 EST 1997 · OSTI ID:629298