Manufacture, Installation, and Testing of New Environmentally Friendly Hydropower Turbine

Technical Report ·
OSTI ID:901068
 [1];
  1. Public Utility District No. 2 of Grant County
Under the U.S. Department of Energy’s Advanced Hydro Turbine Program, the Public Utility District No. 2 of Grant County (Grant PUD) and the U.S. Department of Energy (DOE) shared in the Advanced Hydro Turbine (AHT) design, production support, field testing, and maintenance evaluation. Based on concerns about the ongoing reliability of the Wanapum turbines, Grant PUD explored replacing the Wanapum turbines with AHTs to increase hydraulic efficiency, improve power output, increase hydraulic capacity, achieve equal or better survival of juvenile salmon passage, and improve water quality by reducing spill during periods of high river flows. In February 2005, under DE-FC36-02ID14410, Grant PUD upgraded Unit No. 8 at the Wanapum development of the Priest Rapids Hydroelectric Project (FERC No. 2114) with the installation of an AHT, the first of ten scheduled turbine upgrades at the Wanapum development. In accordance with the July 23, 2004 FERC Order Modifying and Approving Amendment of License Application and consistent with the December 16, 2004 FERC Order Amending License to incorporate the National Marine Fisheries Service’s Biological Opinion issued May 3, 2004, Grant PUD was required to conduct biological testing on the first installed AHT, proving that the AHT met the specified performance criteria for juvenile salmon passage survival. This report summarizes the results of that biological testing, along with the AHT commissioning testing; Computational Fluid Dynamics (CFD) calculations used to gain further insight into the results of biological testing; Sensor Fish Device data acquisition of pressure, acceleration, and rotations changes experienced by migrating fish in severe hydraulic environments; and additional biological (C-start behavior) testing.
Research Organization:
Public Utility District No. 2 of Grant County
Sponsoring Organization:
USDOE
DOE Contract Number:
FC36-02ID14410
OSTI ID:
901068
Report Number(s):
DOE/ID/14410
Country of Publication:
United States
Language:
English

Similar Records

Use of an Autonomous Sensor to Evaluate the Biological Performance of the Advanced Turbine at Wanapum Dam
Journal Article · Wed Oct 13 00:00:00 EDT 2010 · Journal of Renewable and Sustainable Energy, 2(5):053104 · OSTI ID:1000582

Rerouting fish {open_quotes}traffic{close_quotes} in the Columbia River Basin
Journal Article · Sat Jul 01 00:00:00 EDT 1995 · Hydro Review · OSTI ID:229763

The effects of turbine passage on C-start behavior of salmon at the Wanapum Dam, Washington
Technical Report · Thu Jun 01 00:00:00 EDT 2006 · OSTI ID:1218169