skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: PEP-II: An Asymmetric B Factory Based on PEP

Conference ·

An asymmetric B Factory to be installed in the PEP tunnel has been under study at SLAC, LBL, and LLNL for several years [1-4]. A mature design for a 9 GeV x 3.1 GeV electron-positron collider with a design luminosity of 3 x 10{sup 33} cm{sup -2}s{sup -1} is presented. Solutions now exist for all the technical problems, including issues related to high currents (e.g., beam instabilities, feedback systems, vacuum chamber design, lifetime degradation, and radiation power dissipation in the interaction region) and those related to different energies of the beams (e.g., beam separation, beam-beam interaction, and detector requirements). The status of this project, which is being proposed for funding in FY 1993, is discussed.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76SF00515
OSTI ID:
890880
Report Number(s):
SLAC-PUB-11103; TRN: US0703475
Resource Relation:
Conference: Prepared for IEEE 1991 Particle Accelerator Conference (APS Beam Physics), San Francisco, California, 6-9 May 1991
Country of Publication:
United States
Language:
English