An asymmetric B factory based on PEP. Conceptual Design Report
In this report we describe a design for a high-luminosity Asymmetric B Factory to be built in the PEP tunnel on the SLAC site. This proposal, a collaborative effort SLAC, LBL, and LLNL, is the culmination of more than two years of effort aimed at the design and construction of an asymmetric e+e- collider capable of achieving a luminosity of L = 3 x 1033 cm2 s-1}. The configuration adopted utilizes two storage rings, and electron ring operating at 9 GeV and a positron ring at 3.1 GeV, each with a circumference of 2200 m. The high-energy ring is an upgrade of the PEP storage ring at SLAC; all PEP magnets and most power supplies will be reused. The upgrade consists primarily of replacing the PEP vacuum chamber and RF system with newly designed versions optimized for the high-current environment of the B Factory. The low-energy ring will be newly constructed and will be situated atop the high-energy ring in the PEP tunnel. Utilities already installed in the PEP tunnel are largely sufficient to operate the two B Factory storage rings.
- Research Organization:
- Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); SLAC National Accelerator Laboratory (SLAC), Menlo Park, CA (United States); Lawrence Livermore National Laboratory (LLNL), Livermore, CA (United States); California Institute of Technology (CalTech), Pasadena, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (USA)
- DOE Contract Number:
- AC03-76SF00098; AC03-76SF00515; AC03-81ER40050; W-7405-ENG-48; AS03-76ER70285
- OSTI ID:
- 5932901
- Report Number(s):
- LBL-PUB--5303; SLAC--372; SLAC-R--372; CALT--68-1715; UCRL-ID--106426; ON: DE91010911
- Country of Publication:
- United States
- Language:
- English
Similar Records
PEP-II: An asymmetric B factory. Conceptual design report
LUMINOSITY UPGRADE POSSIBILITIES FOR THE PEP-II B-FACTORY
The PEP-II project: Design status and R&D results
Technical Report
·
Tue Jun 01 00:00:00 EDT 1993
·
OSTI ID:10112145
LUMINOSITY UPGRADE POSSIBILITIES FOR THE PEP-II B-FACTORY
Technical Report
·
Thu May 01 00:00:00 EDT 2003
·
OSTI ID:813055
The PEP-II project: Design status and R&D results
Conference
·
Thu Jul 01 00:00:00 EDT 1993
·
OSTI ID:10107641
Related Subjects
43 PARTICLE ACCELERATORS
430400* -- Particle Accelerators-- Storage Rings
645100 -- High Energy Physics-- Particle Interactions & Properties-Experimental
72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS
ASYMMETRY
B MESONS
BEAM INJECTION
BEAMS
BOSONS
COLLIDING BEAMS
COST
CP INVARIANCE
DESIGN
ELECTRON-POSITRON INTERACTIONS
ELEMENTARY PARTICLES
HADRONS
INTERACTIONS
INVARIANCE PRINCIPLES
LEPTON-LEPTON INTERACTIONS
MESONS
PARTICLE INTERACTIONS
PSEUDOSCALAR MESONS
QUALITY ASSURANCE
SAFETY
STORAGE RINGS
430400* -- Particle Accelerators-- Storage Rings
645100 -- High Energy Physics-- Particle Interactions & Properties-Experimental
72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS
ASYMMETRY
B MESONS
BEAM INJECTION
BEAMS
BOSONS
COLLIDING BEAMS
COST
CP INVARIANCE
DESIGN
ELECTRON-POSITRON INTERACTIONS
ELEMENTARY PARTICLES
HADRONS
INTERACTIONS
INVARIANCE PRINCIPLES
LEPTON-LEPTON INTERACTIONS
MESONS
PARTICLE INTERACTIONS
PSEUDOSCALAR MESONS
QUALITY ASSURANCE
SAFETY
STORAGE RINGS