Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

LUMINOSITY UPGRADE POSSIBILITIES FOR THE PEP-II B-FACTORY

Technical Report ·
DOI:https://doi.org/10.2172/813055· OSTI ID:813055

PEP-II is an asymmetric e{sup +}e{sup -} collider being constructed in the SLAC PEP tunnel by SLAC, LBNL, and LLNL. The two beams have energies of 3.1 GeV and 9.0 GeV and are made to collide at a single interaction point. PEP-II has a 2200 m circumference. The nominal parameters for PEP-II are listed in Table 1. The High Energy Ring (HER) of PEP-II started commissioning in 1997. The Low Energy Ring (LER) will be commissioned in the summer of 1998. The BaBar detector is to be installed starting January 1999. Studies for increasing the luminosity in PEP-II beyond the design are underway. A brief summary of the possibilities are presented here. Improvements to the integrated luminosity will be implemented gradually. Major luminosity improvements will likely come in two phased upgrades. Several of these possibilities are summarized in Table 1.

Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (US)
Sponsoring Organization:
USDOE Office of Science (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
813055
Report Number(s):
SLAC-PUB-9752
Country of Publication:
United States
Language:
English

Similar Records

PEP-II Operations Report
Conference · Tue Oct 31 23:00:00 EST 2000 · OSTI ID:771956

Last Year of PEP-II B-Factory Operation
Conference · Wed Nov 02 00:00:00 EDT 2011 · Conf.Proc.C0806233:tuxg01,2008 · OSTI ID:1028693

Parameters for the PEP-II B-Factory at SLAC in 2008
Journal Article · Mon Nov 21 23:00:00 EST 2011 · ICFA Beam Dynamics Newsletter · OSTI ID:1029903