Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Parameters for the PEP-II B-Factory at SLAC in 2008

Journal Article · · ICFA Beam Dynamics Newsletter
OSTI ID:1029903

The PEP-II B-Factory at SLAC (3.1 GeV e{sup +} x 9.0 GeV e{sup -}) operated from 1999 to 2008, delivering luminosity to the BaBar experiment. The design luminosity was reached after one and a half years of operation. In the end PEP-II surpassed, by four times, its design luminosity reaching 1.21 x 10{sup 34} cm{sup -2}s{sup -1}. It also set world stored beam current records of 2.1 A e{sup -} and 3.2 A e{sup +}. Continuous injection was implemented with BaBar successfully taking data. The total delivered luminosity to the BaBar detector was 557.4 fb{sup -1} spanning five upsilon resonances. PEP-II was constructed by SLAC, LBNL, and LLNL with help from BINP, IHEP, the BaBar collaboration, and the US DOE OHEP.

Research Organization:
SLAC National Accelerator Laboratory (SLAC)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76SF00515
OSTI ID:
1029903
Report Number(s):
SLAC-REPRINT-2011-090
Journal Information:
ICFA Beam Dynamics Newsletter, Journal Name: ICFA Beam Dynamics Newsletter Vol. 48
Country of Publication:
United States
Language:
English

Similar Records

Last Year of PEP-II B-Factory Operation
Conference · Wed Nov 02 00:00:00 EDT 2011 · Conf.Proc.C0806233:tuxg01,2008 · OSTI ID:1028693

Beam-Beam Interaction at the PEP-II E+ E- Collider
Journal Article · Fri Jun 22 00:00:00 EDT 2012 · ICFA Beam Dyn.Newslett.52:55-67,2010 · OSTI ID:1043837

Performance of the PEP-II B-Factory Collider at SLAC
Conference · Thu Mar 02 23:00:00 EST 2006 · OSTI ID:877216