Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

PGandE Geysers Retrofit Project, Milestone Report No. 2 (Units 5-12)

Technical Report ·
DOI:https://doi.org/10.2172/883326· OSTI ID:883326
Milestone Report No. 1 was delivered on June 1, 1979 and related to the conversion of Units 1-4. Milestone Report No. 2 describes the conversion of Units 5-12 from direct contact condensers which use the iron-catalyst/peroxide/caustic systems to surface condensers and H{sub 2}S abatement with the Stretford Process Unit. This Report is a 10 week progress report that specifically addresses itself to the differences that are encountered between Units 5-6, 7-10 and 11-12. The task schedule shown in the Summary Section was originally presented to PG and E at the Project Kick-Off Meeting on Monday, April 23. Units 11 and 12 retrofit concept which appears in this report was evaluated with a two pass surface condenser running parallel to the turbine shaft. This concept requires the relocation of the turbine lube oil tank, instrument air compressor and battery storage rack facilities. On Wednesday, June 27, the condenser supplier notified Rogers Engineering that it was feasible to design and install a four pass, two tube bundle condenser at right angle condenser to the turbine-generator shaft. The four pass condenser concept will eliminate the need of relocating equipment sensitive to turbine operation. However, schedule requirements for Milestone Report No. 2 left no time to incorporate the benefits of the concept they believe will be recommended by Rogers. It will appear in the Final Milestone Report No. 4.
Research Organization:
Rogers Engineering Co., Inc., San Francisco, CA
Sponsoring Organization:
USDOE
OSTI ID:
883326
Country of Publication:
United States
Language:
English

Similar Records

PGandE Geysers Retrofit Project, Milestone Report No. 3 (Stretford Processes Units 1-12)
Technical Report · Fri Jun 29 00:00:00 EDT 1979 · OSTI ID:883324

PG and E Geysers Retrofit Project: Milestone Report No. 1
Technical Report · Mon Jun 04 00:00:00 EDT 1979 · OSTI ID:883325

PGandE Geysers Retrofit Project, Units 1-12 Condensed Final Report
Technical Report · Fri Aug 24 00:00:00 EDT 1979 · OSTI ID:883235