PGandE Geysers Retrofit Project, Milestone Report No. 3 (Stretford Processes Units 1-12)
Milestone Report No. 3 is a progress report. Rogers Engineering Co., Inc. has investigated what sites are best suited for consolidation of power generating units 1 through 12 for processing the noncondensable gases through the Stretford Process for H{sub 2}S abatement below 10% of the mass flow. The consolidation arrangement for the power generating units are Units 1 through 6 which produces 187 MWe power. Units 7-8 and 11 producing 212 MWe and Units 9-10 and 12 which also produces 212 MWe power. Site survey and selection for the Stretford units provided for a primary and alternative site for each consolidation. Each of these three groups of plants is associated with its Stretford Process Plant. The gas blowers located at each power plant to push the noncondensable gases through the stainless steel pipe network to the Stretford Process have been sized. When combining the new auxiliary load requirements of these blowers and the Stretford units it was determined that additional auxiliary transformer capacity is necessary. We are investigating additional alternatives with respect to the Stretford Process application. This data will be submitted in the Final Report, See Section 6.
- Research Organization:
- Rogers Engineering Co., Inc., San Francisco, CA
- Sponsoring Organization:
- USDOE
- OSTI ID:
- 883324
- Country of Publication:
- United States
- Language:
- English
Similar Records
PGandE Geysers Retrofit Project, Units 1-12 Condensed Final Report
PGandE Geysers Retrofit Project, Milestone Report No. 2 (Units 5-12)
PG and E Geysers Retrofit Project: Milestone Report No. 1
Technical Report
·
Fri Aug 24 00:00:00 EDT 1979
·
OSTI ID:883235
PGandE Geysers Retrofit Project, Milestone Report No. 2 (Units 5-12)
Technical Report
·
Fri Jun 29 00:00:00 EDT 1979
·
OSTI ID:883326
PG and E Geysers Retrofit Project: Milestone Report No. 1
Technical Report
·
Mon Jun 04 00:00:00 EDT 1979
·
OSTI ID:883325