Commissioning of the SNS front-end systems at Berkeley Lab
Conference
·
OSTI ID:861159
Construction of a 2.5-MeV linac injector, the Front-End (FE) for the Spallation Neutron Source (SNS) project, was completed in the spring of 2002. Of the major FE subsystems, the rf-driven H- ion source, the electrostatic LEBT, and the first of four RFQ modules had been commissioned by the spring of 2001, and commissioning of the remaining RFQ modules as well as the full system including the elaborate MEBT was carried out in Jan. through May, 2002. The Front End will be shipped to Oak Ridge, starting in June, 2002, and re-commissioned after installation at the SNS site. This paper gives an overview of FE major design features and experimental results obtained during the commissioning process at LBNL.
- Research Organization:
- Ernest Orlando Lawrence Berkeley NationalLaboratory, Berkeley, CA (US)
- Sponsoring Organization:
- USDOE Director, Office of Science
- DOE Contract Number:
- AC02-05CH11231
- OSTI ID:
- 861159
- Report Number(s):
- LBNL--49357; BnR: 820101000
- Country of Publication:
- United States
- Language:
- English
Similar Records
Results of the SNS front end commissioning at Berkeley Lab
Progress with the SNS front-end systems
The SNS front-end, an injector for a high-power hydrogen-ion accelerator
Conference
·
Fri Aug 16 00:00:00 EDT 2002
·
OSTI ID:805140
Progress with the SNS front-end systems
Conference
·
Tue May 01 00:00:00 EDT 2001
·
OSTI ID:783486
The SNS front-end, an injector for a high-power hydrogen-ion accelerator
Conference
·
Thu Jan 31 23:00:00 EST 2002
·
OSTI ID:805119