Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Results of the SNS front end commissioning at Berkeley Lab

Conference ·
OSTI ID:805140
The Front-End Systems (FES) for the Spallation Neutron Source (SNS) project comprise an rf-driven H{sup -} ion source, an electrostatic 2-lens LEBT, a 2.5 MeV RFQ, followed by a 14-quadrupole, 4-rebuncher MEBT including traveling-wave fast choppers. The nominal 2.5 MeV H{sup -} beam has a current of 38 mA at a repetition rate of 60 Hz and 1 ms pulse length, for a macro duty-factor of 6%, and is chopped at a rate of approximately 1 MHz with a mini duty-factor of 68%. The normalized rms beam emittance at the MEBT exit, matching the first tank of a 402.5 MHz Alvarez linac, is measured to be approximately 0.3 {pi} mm mrad. Diagnostic elements include wire scanners, BPMs, fast current monitors, a slit-harp emittance device and RFQ field monitoring probes. The results of the beam commissioning and the operation of the RFQ and diagnostic instrumentation are reported. The entire FES was shut down at LBNL at the end of May 2002 and will be recommissioned at ORNL prior to installation of the drift-tube linac.
Research Organization:
Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley, CA (US)
Sponsoring Organization:
USDOE Director, Office of Science. Office of Basic Energy Studies (US)
DOE Contract Number:
AC03-76SF00098
OSTI ID:
805140
Report Number(s):
LBNL--51411; B& R 820101000
Country of Publication:
United States
Language:
English

Similar Records

Mechanical design of the SNS MEBT
Conference · Mon Jun 11 00:00:00 EDT 2001 · OSTI ID:785264

H{sup -} beam transport experiments in a solenoid low energy beam transport
Journal Article · Tue Feb 14 23:00:00 EST 2012 · Review of Scientific Instruments · OSTI ID:22066321

Commissioning of the SNS front-end systems at Berkeley Lab
Conference · Wed May 01 00:00:00 EDT 2002 · OSTI ID:861159