Busted Butte Phase II Excavation Analysis
The purpose of this analysis is to provide an engineering excavation and ground support design for the Busted Butte phase II mine back. The analysis will apply engineering practices and previous proven design methods for pillar design and ground support in accordance with applicable Integrated Safety Management principles and functions. The scope of this analysis is limited to the Busted Butte Test Facility. The intended use of this analysis is to provide testing excavation boundaries, ground support and pillar design input to drawing(s) to support test operations implementation. This design activity has been prepared under ''Technical Work Plan For Test Facilities Design FY01 Work Activities'' (TWP) (CRWMS M&O 2000b). No deviations from the TWP have been necessary for this analysis.
- Research Organization:
- YMP (Yucca Mountain Project, Las Vegas, Nevada)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- NA
- OSTI ID:
- 850413
- Report Number(s):
- BABEE0000-01717-0200-00025 REV 00; MOL.20001218.0004, DC#26850; TRN: US0600408
- Country of Publication:
- United States
- Language:
- English
Similar Records
Determination of Importance Evaluation for Exploratory Studies Facility (ESF) Subsurface Testing Activities
ECRB REFUGE CHAMBER