Title: Busted Butte Phase II Excavation Analysis

Abstract

The purpose of this analysis is to provide an engineering excavation and ground support design for the Busted Butte phase II mine back. The analysis will apply engineering practices and previous proven design methods for pillar design and ground support in accordance with applicable Integrated Safety Management principles and functions. The scope of this analysis is limited to the Busted Butte Test Facility. The intended use of this analysis is to provide testing excavation boundaries, ground support and pillar design input to drawing(s) to support test operations implementation. This design activity has been prepared under ''Technical Work Plan For Test Facilities Design FY01 Work Activities'' (TWP) (CRWMS M&O 2000b). No deviations from the TWP have been necessary for this analysis.

Authors:
Publication Date:
Research Org.:
YMP (Yucca Mountain Project, Las Vegas, Nevada)
Sponsoring Org.:
USDOE
OSTI Identifier:
850413
Report Number(s):
BABEE0000-01717-0200-00025 REV 00
MOL.20001218.0004, DC#26850; TRN: US0600408
DOE Contract Number:  
NA
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 58 GEOSCIENCES; DESIGN; EXCAVATION; SAFETY; TEST FACILITIES; STRATA CONTROL; UNDERGROUND FACILITIES; RADIOACTIVE WASTE DISPOSAL; SUPPORT PILLARS

Citation Formats

Keifer, J W. Busted Butte Phase II Excavation Analysis. United States: N. p., 2000. Web. doi:10.2172/850413.
Keifer, J W. Busted Butte Phase II Excavation Analysis. United States. https://doi.org/10.2172/850413
Keifer, J W. 2000. "Busted Butte Phase II Excavation Analysis". United States. https://doi.org/10.2172/850413. https://www.osti.gov/servlets/purl/850413.
@article{osti_850413,
title = {Busted Butte Phase II Excavation Analysis},
author = {Keifer, J W},
abstractNote = {The purpose of this analysis is to provide an engineering excavation and ground support design for the Busted Butte phase II mine back. The analysis will apply engineering practices and previous proven design methods for pillar design and ground support in accordance with applicable Integrated Safety Management principles and functions. The scope of this analysis is limited to the Busted Butte Test Facility. The intended use of this analysis is to provide testing excavation boundaries, ground support and pillar design input to drawing(s) to support test operations implementation. This design activity has been prepared under ''Technical Work Plan For Test Facilities Design FY01 Work Activities'' (TWP) (CRWMS M&O 2000b). No deviations from the TWP have been necessary for this analysis.},
doi = {10.2172/850413},
url = {https://www.osti.gov/biblio/850413}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Nov 29 00:00:00 EST 2000},
month = {Wed Nov 29 00:00:00 EST 2000}
}