skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RF System Research and Development for the PEP-II B Factory

Journal Article · · Nuclear Instruments and Methods in Physics Research B
OSTI ID:841040

The PEP-II B factory will be a high-luminosity asymmetric electron-positron collider optimized for the study of CP violation. It is being built at SLAC by a collaboration including SLAC, LBL, and LLNL. The integrated-luminosity needed for the experiment require high average beam current in the two storage rings and this creates significant challenges in the design of the RF system and other components. The paper describes the R & D activities in progress towards meeting these challenges and some of the significant achievements in the areas of RF cavity design, higher-order mode damping, RF window design and feedback systems.

Research Organization:
Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
Sponsoring Organization:
USDOE Director. Office of Energy Research. Office of High Energy and Nuclear Physics, Contracts DE-AC03-76SF00098 and DE-AC03-76SF00515 and W-7405-ENG-48 (US)
DOE Contract Number:
AC03-76SF00098
OSTI ID:
841040
Report Number(s):
LBL-36253; R&D Project: 455101; TRN: US200513%%284
Journal Information:
Nuclear Instruments and Methods in Physics Research B, Vol. 99; Other Information: Journal Publication Date: 1995; PBD: 1 Nov 1994
Country of Publication:
United States
Language:
English