Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

PEP-II RF System Operation and Performance

Technical Report ·
DOI:https://doi.org/10.2172/839731· OSTI ID:839731
The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since July 1998 and have assisted in breaking all design luminosity records back in June 2001. Luminosity on PEP-II has steadily increased since then as a consequence of larger e+ and e- beam currents being accumulated. This has meant that the RF systems have inevitably been driven harder, not only to achieve these higher stored beam currents, but also to reliably keep the beams circulating whilst at the same time minimizing the number of aborts due to RF system faults. This paper details the current PEP-II RF system configurations for both rings, as well as future upgrade plans spanning the next 3-5 years. Limitations of the current RF system configurations are presented, highlighting improvement projects which will target specific areas within the RF systems to ensure that adequate operating overheads are maintained and reliable operation is assured. The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since July 1998 and have assisted in breaking all design luminosity records back in June 2001. Luminosity on PEP-II has steadily increased since then as a consequence of larger e+ and e- beam currents being accumulated. This has meant that the RF systems have inevitably been driven harder, not only to achieve these higher stored beam currents, but also to reliably keep the beams circulating whilst at the same time minimizing the number of aborts due to RF system faults. This paper details the current PEP-II RF system configurations for both rings, as well as future upgrade plans spanning the next 3-5 years. Limitations of the current RF system configurations are presented, highlighting improvement projects which will target specific areas within the RF systems to ensure that adequate operating overheads are maintained and reliable operation is assured.
Research Organization:
Stanford Linear Accelerator Center (SLAC), Menlo Park, CA
Sponsoring Organization:
SC
DOE Contract Number:
AC02-76SF00515
OSTI ID:
839731
Report Number(s):
SLAC-PUB-10984
Country of Publication:
United States
Language:
English

Similar Records

Beam Comissioning of the PEP-II High Energy Ring
Conference · Wed Nov 11 23:00:00 EST 1998 · OSTI ID:940563

Analysis of Longitudinal Beam Dynamics Behavior and RF System Operative Limits at High Beam Currents in Storage Rings
Journal Article · Mon Jul 07 00:00:00 EDT 2008 · Physical Review Special Topics--Accelerators and Beams · OSTI ID:934746

LUMINOSITY UPGRADE POSSIBILITIES FOR THE PEP-II B-FACTORY
Technical Report · Thu May 01 00:00:00 EDT 2003 · OSTI ID:813055