skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Commissioning of the Argonne positron accumulator ring

Conference ·
OSTI ID:83869

The Advanced Photon Source (APS) injector consists of a 250-MeV electron linac, a 450-MeV positron linac, a 450-MeV positron accumulator ring (PAR), and a 7-GeV synchrotron. The purpose of the PAR is to accumulate and damp positrons from the 60-Hz linac during each cycle of the 2-Hz synchrotron, thus increasing the fill rate for the main ring. This paper discusses the rapid progress of PAR commissioning. Less than a year was required from first acceptance of beam to transfer of PAR operations to the APS Operations Group. PAR has been well characterized and already meets most of its design specifications. An accurate model has been developed for linear and chromatic properties. Hardware improvements are planned to allow specifications to be fully met.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-31-109-ENG-38
OSTI ID:
83869
Report Number(s):
ANL/ASD/CP-85010; CONF-950512-234; ON: DE95013753; TRN: 95:017231
Resource Relation:
Conference: 16. Institute of Electrical and Electronic Engineers (IEEE) particle accelerator conference, Dallas, TX (United States), 1-5 May 1995; Other Information: PBD: [1995]
Country of Publication:
United States
Language:
English

Similar Records

Construction and commissioning of the positron accumulator ring for the APS
Conference · Sat Dec 31 00:00:00 EST 1994 · OSTI ID:83869

Construction and commissioning of the positron accumulator ring for the APS
Conference · Sat Dec 31 00:00:00 EST 1994 · OSTI ID:83869

The positron accumulator ring for the APS
Conference · Sun Jan 01 00:00:00 EST 1989 · OSTI ID:83869