skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Construction and commissioning of the positron accumulator ring for the APS

Conference ·
OSTI ID:34391

The injector for the Advanced Photon Source (APS) incorporates a 450-MeV positron accumulator ring (PAR) to accumulate and damp positrons from the 60Hz linac during each cycle of the 2-Hz synchrotron. An overview of PAR hardware is presented. Commissioning of the PAR is well underway using electrons. Studies have produced a modified lattice model using three free parameters that agrees well with measurements. Principle problems are high leakage fields from the septum and ion trapping.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
34391
Report Number(s):
ANL/ASD/CP-83476; CONF-941129-20; ON: DE95005868; TRN: 95:009551
Resource Relation:
Conference: 13. international conference on the application of accelerators in research and industry, Denton, TX (United States), 7-10 Nov 1994; Other Information: PBD: [1994]
Country of Publication:
United States
Language:
English