Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Proceedings: Fifth EPRI Balance-of-Plant Heat Exchanger NDE Symposium

Conference ·
OSTI ID:837175

This publication is a compilation of the agenda and material presented at the Fifth EPRI Steam Balance-of-Plant Heat Exchanger NDE Symposium which was held on June 15-17, 1997 at Lake Tahoe, Nevada. Along with the proceedings of the symposium, an attendance list is included in this document. The topics that are presented in the symposium are included in this publication in a Plenary Session and Sessions 1, 2, 3 and 4. An overview of the American Society for Nondestructive Testing (ASNT) Central Certification Program is presented in the Plenary Session. The following is a sampling of titles presented in the other sessions: An Engineer's Guide to Eddy Current Testing; ID Pit Sizing in a Carbon Steel Tubed Fuel Oil Storage Transfer Heater; Pilgrim Feedwater Heater Tube Repair; Through the Tube Plugging Application for Once Through Heat Exchangers; PFEC Inspection Method for Detection and Sizing of Uniform Wall Thinning; Some Characteristics of Pulsed Eddy Current Technique in Ferromagnetic Heat Exchanger Tubing; Utility Perspective on PC Based Database Management and Analysis Software; and NDE Demonstration and Inspection of Ginna Power Plant Moisture Separator Finned Tubing.

Research Organization:
Electric Power Research Inst., Palo Alto, CA (US)
Sponsoring Organization:
Electric Power Research Institute (EPRI) (US)
OSTI ID:
837175
Report Number(s):
EPRI--GC-110385
Country of Publication:
United States
Language:
English