Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

First Full Beam Loading Operation with the CTF3 Linac

Technical Report ·
DOI:https://doi.org/10.2172/833095· OSTI ID:833095
The aim of the CLIC (Compact Linear Collider) Study is to investigate the feasibility of a high luminosity, multi-TeV linear e+e- collider. CLIC is based on a two-beam method, in which a high current drive beam is decelerated to produce 30 GHz RF power needed for high-gradient acceleration of the main beam running parallel to it. To demonstrate the outstanding feasibility issues of the scheme a new CLIC Test Facility, CTF3, is being constructed at CERN by an international collaboration. In its final configuration CTF3 will consist of a 150 MeV drive beam linac followed by a 42 m long delay loop and an 84 m combiner ring. The installation will include a 30 GHz high power test stand, a representative CLIC module and a test decelerator. The first part of the linac was installed and commissioned with beam in 2003. The first issue addressed was the generation and acceleration of a high-current drive beam in the ''full beam loading'' condition where RF power is converted into beam power with an efficiency of more than 90 %. The full beam loading operation was successfully demonstrated with the nominal beam current of 3.5 A. A variety of beam measurements have been performed, showing good agreement with expectations.
Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (US)
Sponsoring Organization:
USDOE Office of Science (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
833095
Report Number(s):
SLAC-PUB-10762
Country of Publication:
United States
Language:
English

Similar Records

Experimental Studies on Drive Beam Generation in CTF3
Conference · Tue Jul 01 00:00:00 EDT 2008 · OSTI ID:956013

CTF3 Design Report
Technical Report · Wed Mar 12 23:00:00 EST 2003 · OSTI ID:812960

Demonstration of two-beam acceleration and 30 GHz power production in the CLIC Test Facility
Journal Article · Fri May 07 00:00:00 EDT 1999 · AIP Conference Proceedings · OSTI ID:21205511