Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Demonstration of two-beam acceleration and 30 GHz power production in the CLIC Test Facility

Journal Article · · AIP Conference Proceedings
DOI:https://doi.org/10.1063/1.59015· OSTI ID:21205511
The Compact Linear Collider (CLIC) Test Facility (CTF II) at CERN has recently demonstrated Two-Beam power production and acceleration at 30 GHz. With 41 MW of 30 GHz power produced in 14 ns pulses at a repetition rate of 5 Hz, the main beam has been accelerated by 28 MeV. The 30 GHz RF power is extracted in low impedance decelerating structures from a low-energy, high-current 'drive beam' which runs parallel to the main beam. The average current in the drive-beam train is 25 A, while the peak current exceeds 2 kA. Crosschecks between measured drive-beam charge, 30 GHz power and main-beam energy gain are in good agreement. In this paper, some relevant experimental and technical issues on drive-beam generation, two-beam power production and acceleration are presented.
OSTI ID:
21205511
Journal Information:
AIP Conference Proceedings, Journal Name: AIP Conference Proceedings Journal Issue: 1 Vol. 474; ISSN APCPCS; ISSN 0094-243X
Country of Publication:
United States
Language:
English

Similar Records

30 GHz High Power Production for CLIC
Journal Article · Mon Jan 02 23:00:00 EST 2006 · AIP Conference Proceedings · OSTI ID:20787683

Efficiencies of 30 GHz power generation for CLIC
Journal Article · Wed Jul 05 00:00:00 EDT 1995 · AIP Conference Proceedings · OSTI ID:165459

Demonstration of the High RF Power Production Feasibility in the CLIC Power Extraction and Transfer Structure (PETS)
Journal Article · Wed Apr 25 00:00:00 EDT 2012 · Nuclear Instruments and Methods in Physics Research, Section A · OSTI ID:1039179