Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

PRACTICAL EXERIENCES WITH THE 6 GYROTRON SYSTEM ON THE DIII-D TOKAMAK

Conference ·
OSTI ID:823622
OAK-B135 The gyrotron installation on the DIII-D tokamak now comprises six 110 GHz gyrotrons in the 1 MW class, three manufactured by CPI[1] and three by Gycom [2]. Two tetrode rectifier/modulator/regulator power supplies were constructed to provide power for the CPI gyrotrons. A second system uses three mod/reg tetrodes connected in parallel, which are fed by a dual parallel tetrode mod/reg to power the Gycom tubes. the windowless evacuated transmission lines are up to 100 m in length, with 80% transmission efficiency. Engineering solutions were developed in specific problematic areas encountered in the development of this complex system, including: Gyrotron instability; high voltage circuit instability; gyrotron conditioning; rf beam forming and coupling to waveguide; output window vacuum seals; material control; launcher mechanics and diagnosis; polarizer mechanics; dummy loads; power measurements; polarization measurements; cooling; calorimetry; and operating controls. The system is in routine operation in support of tokamak experiments, with peak generated power of about 5 MW at 2 s. pulse length and about 3 MW for 5 s. pulses. This presentation focuses on practical lessons learned in the development and operation of these systems.
Research Organization:
GENERAL ATOMICS (US)
Sponsoring Organization:
(US)
DOE Contract Number:
AC03-99ER54463
OSTI ID:
823622
Report Number(s):
GA-A24486
Country of Publication:
United States
Language:
English

Similar Records

GYROTRON POWER BALANCE BASED ON CALORIMETRIC MEASUREMENTS IN THE DIII-D ECH SYSTEM
Conference · Wed Oct 01 00:00:00 EDT 2003 · OSTI ID:823615

The DIII-D 3 MW, 110 GHz ECH System
Conference · Thu Jul 01 00:00:00 EDT 1999 · OSTI ID:766946

The DIII-D 3 MW, 110 GHz ECH system
Journal Article · Mon Sep 20 00:00:00 EDT 1999 · AIP Conference Proceedings · OSTI ID:20216718