Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Electric utility system benefits of factory packaged GE LM Modular Generator sets

Conference ·
OSTI ID:81471

Electric utility system benefits of factory packaged GE LM modular generator sets are outlined. The following topics are discussed: GE LM gas turbine history, operating experience, maintenance, gas turbine spare engines, modular gas turbine generator sets, typical LM2500 cogeneration plant and STIG cycle plant, factory packaging concept, gas turbine/generator package, performance, comparison, competitive capital cost, phased construction, comparison of revenue requirements, capacity evaluation, heat rate evaluation, fuel evaluation, startup, and dispatch flexibility without maintenance penalty.

Research Organization:
USDOE, Washington, DC (United States); Korea Electric Power Corp. (KEPCO), Seoul (Korea, Republic of)
OSTI ID:
81471
Report Number(s):
CONF-941089--Vol.2; ON: DE95011613
Country of Publication:
United States
Language:
English

Similar Records

Operating experience with a daily-dispatched LM-5000 STIG cogeneration plant
Conference · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:85999

Factory packaged modular power plants
Technical Report · Thu Nov 30 23:00:00 EST 1995 · OSTI ID:226980

Aeroderivative gas turbine performance, emmisions and STIG
Journal Article · · Turbomachinery International; (United States) · OSTI ID:5436913