A Practical Guide for Commissioning Existing Buildings

Technical Report ·
DOI:https://doi.org/10.2172/814521· OSTI ID:814521

Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

Research Organization:
ORNL Oak Ridge National Laboratory (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC05-00OR22725
OSTI ID:
814521
Report Number(s):
ORNL/TM-1999/34
Country of Publication:
United States
Language:
English

Similar Records

A Practical Guide for Commissioning Existing Buildings
Technical Report · Wed Mar 31 23:00:00 EST 1999 · OSTI ID:15043

Improving building energy system performance by continuous commissioning
Journal Article · Fri Oct 01 00:00:00 EDT 1999 · Energy Engineering · OSTI ID:680090

Retrocommissioning: Further discussion roundtable
Conference · Sat Oct 31 23:00:00 EST 1998 · OSTI ID:663585