Status of the PEP-II B-Factory High Energy Ring
- SLAC
The 9 GeV High Energy Ring (HER) of the PEP-II B Factory is an electron storage ring under construction at SLAC. Significant progress has been made in the last year on all systems. As of mid 1996, all 192 dipoles have been installed, with installation of the quadrupoles underway. The vacuum system, for design currents up to 3 A average, is in production using a recently commissioned e-beam welder. Beam instrumentation systems are being fabricated. The interaction region will bring the HER beam into collision with the 3 GeV beam of the Low Energy Ring; design of this section of the HER is in an advanced stage.
- Research Organization:
- Stanford Linear Accelerator Center, Menlo Park, CA (US)
- Sponsoring Organization:
- USDOE Office of Science (US)
- DOE Contract Number:
- AC03-76SF00515
- OSTI ID:
- 813198
- Report Number(s):
- SLAC-PUB-9911
- Country of Publication:
- United States
- Language:
- English
Similar Records
Status of the PEP-II B-factory high energy ring
LUMINOSITY UPGRADE POSSIBILITIES FOR THE PEP-II B-FACTORY
KEKB and PEP-II B Factories
Conference
·
Sun Dec 31 23:00:00 EST 1995
·
OSTI ID:484506
LUMINOSITY UPGRADE POSSIBILITIES FOR THE PEP-II B-FACTORY
Technical Report
·
Thu May 01 00:00:00 EDT 2003
·
OSTI ID:813055
KEKB and PEP-II B Factories
Conference
·
Tue Dec 31 23:00:00 EST 1996
·
OSTI ID:491601