Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Fermilab booster beam collimation and shielding

Conference ·
OSTI ID:811234

The beam power in the upgraded Booster at 8 GeV and 10 Hz will be 64 kW. Beam loss can result in high radiation loads in the ring. The purpose of a new beam halo cleaning system is to localize proton losses in specially shielded regions. Calculations show that this 2-stage collimation system will localize about 99% of beam loss in straight sections 6 and 7 and immediately downstream. Beam loss in the rest of the machine will be on average 0.1W/m. Local shielding will provide tolerable prompt and residual radiation levels in the tunnel, above the tunnel at the surface and in the sump water. Results of thorough MARS calculations are presented for a new design which includes shielding integrated with the collimators, motors and controls ensuring a high performance and facilitating maintenance. First measurements of the collimation efficiency are presented.

Research Organization:
Fermi National Accelerator Lab., Batavia, IL (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
811234
Report Number(s):
FERMILAB-Conf-03/087
Country of Publication:
United States
Language:
English

Similar Records

Beam loss, residual radiation, and collimation and shielding in the Fermilab booster
Conference · Fri Jul 20 00:00:00 EDT 2001 · OSTI ID:783057

A Novel Two Stage Collimation Unit for Fermilab Booster
Conference · Tue Jul 02 00:00:00 EDT 2024 · OSTI ID:2396717

Beam loss and collimation in the Fermilab 16 GeV proton driver
Conference · Fri Jul 20 00:00:00 EDT 2001 · OSTI ID:783054