BOA: Asbestos pipe insulation removal robot system. Phase 1

Technical Report ·
DOI:https://doi.org/10.2172/80893· OSTI ID:80893

The project described in this report targets the development of a mechanized system for safe, cost-efficient and automated abatement of asbestos containing materials used as pipe insulation. Based on several key design criteria and site visits, a proof-of-concept prototype robot system, dubbed BOA, was designed and built, which automatically strips the lagging and insulation from the pipes, and encapsulates them under complete vacuum operation. The system can operate on straight runs of piping in horizontal or vertical orientations. Currently we are limited to four-inch diameter piping without obstacles as well as a somewhat laborious emplacement and removal procedure -- restrictions to be alleviated through continued development. BOA removed asbestos at a rate of 4-5 ft./h compared to 3 ft./h for manual removal of asbestos with a 3-person crew. The containment and vacuum system on BOA was able to achieve the regulatory requirement for airborne fiber emissions of 0.01 fibers/ccm/ 8-hr. shift. This program consists of two phases. The first phase was completed and a demonstration was given to a review panel, consisting of DOE headquarters and site representatives as well as commercial abatement industry representatives. Based on the technical and programmatic recommendations drafted, presented and discussed during the review meeting, a new plan for the Phase II effort of this project was developed. Phase 11 will consist of a 26-month effort, with an up-front 4-month site-, market-, cost/benefit and regulatory study before the next BOA robot (14 months) is built, and then deployed and demonstrated (3 months) at a DOE site (such as Fernald or Oak Ridge) by the beginning of FY`97.

Research Organization:
Carnegie-Mellon Univ., Pittsburgh, PA (United States). Robotics Inst.
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AR21-93MC30362
OSTI ID:
80893
Report Number(s):
DOE/MC/30362--4049; ON: DE95000095
Country of Publication:
United States
Language:
English

Similar Records

BOA: Asbestos pipe-insulation removal robot system. Phase I. Topical report, November 1993--December 1994
Technical Report · Sat Dec 31 23:00:00 EST 1994 · OSTI ID:211314

BOA: Pipe-asbestos insulation removal robot system
Conference · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:10189892

BOA: Asbestos pipe-insulation removal robot system, Phase 2. Topical report, January--June 1995
Technical Report · Thu Jun 01 00:00:00 EDT 1995 · OSTI ID:212487