Acceptance for Beneficial Use (ABU) Update for 241-AW-104 Waste Transfer Project

Technical Report ·
DOI:https://doi.org/10.2172/805936· OSTI ID:805936
In October of 2000 an Engineering Task Plan (ETP), RPP-6869, was drafted to define objectives, document requirements, and define organizational responsibilities for the purpose of design installation and turnover of the 241-AW-104 Pump Replacement Project. The ETP included an Acceptance For Beneficial Use (ABU) checklist, which delineated all tasks necessary to turn the 241-AW-104 Replaced Transfer Pump over to Operations, Maintenance, and Plant Engineering. Signature approval of the respective Engineering Data Transmittal (EDT 630501) signified agreement that the ABU checklist was all-inclusive. This supporting document is to serve three purposes: (1) to collectively index all documentation requirements identified in the ABU Checklist; (2) to demonstrate formal completion of all requirements of the ABU Checklist for this project, and; (3) to transfer responsibility for operating and maintaining the 241-AW-104 transfer pump from the Pump Replacement Project to east tank farms.
Research Organization:
COGEMA (US)
Sponsoring Organization:
USDOE Office of Environmental Management (EM) (US)
DOE Contract Number:
AC27-99RL14047
OSTI ID:
805936
Report Number(s):
RPP-7589, Rev.0; EDT-624153
Country of Publication:
United States
Language:
English