Synchrotron radiation issues in future hadron colliders
- Fermilab
Hadron machines mostly use high field superconducting magnets operating at low temperatures. Therefore the issue of extracting a SR power heat load becomes more critical and costly. Conceptual solutions to the problem exist in the form of beam screens and photon stops. Cooled beam screens are more expensive in production and operation than photon stops, but they are, unlike photon stops, routinely used in existing machines. Photon stops are the most economical solution because the heat load is extracted at room temperature. They presently consider it most prudent to work with a combined beam screen and photon stop approach, in which the photon stop absorbs most of the SR power, and the beam screen serves only the vacuum purpose. Provided that the recently launched photon stop R and D [10] supports it, we would like to explore solutions with photon stops only. This would allow to reduce the magnet apertures to a certain extent with respect to those required to accommodate high SR power compliant beam screens and reduce cost. The possibility of magnet designs, which have larger vertical apertures where large cooling capillaries can be housed at no additional cost, would allow to soften this statement somewhat and should therefore be pursued as well.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 804897
- Report Number(s):
- FERMILAB-CONF-01-434; SNOWMASS-2001-T203; oai:inspirehep.net:572569; TRN: US0205602
- Journal Information:
- eConf, Vol. C010630; Other Information: PBD: 21 Nov 2002
- Country of Publication:
- United States
- Language:
- English
Similar Records
FEASIBILITY EVALUATION AND RETROFIT PLAN FOR COLD CRUCIBLE INDUCTION MELTER DEPLOYMENT IN THE DEFENSE WASTE PROCESSING FACILITY AT SAVANNAH RIVER SITE - 8118
Feasibility Evaluation and Retrofit Plan for Cold Crucible Induction Melter Deployment in the Defense Waste Processing Facility at Savannah River Site